Building permit — Addition / Alteration · BP-2023-00991
Field Review - Addition / Alteration - #320 - 3rd Floor Interior alterations to provide tenant improvements to an existing General Office and to combine units on the 3rd floor (#320 & #330) creating one new office space (#320) in this existing commercial building on site. Scope of work: Remove all non-load bearing partition walls, fixtures, doors, frames, and flooring. Demolish/construct a demising wall to widen the public corridor, new lighting, electrical and sprinkler work. NOTE: THIS APPLICATION IS TO LEGALIZE/VALIDATE THE DEMISING WALL (WWOP) BEING REMOVED BY THE PREVIOUS OWNER. Revision #1. Interior alterations for future office tenant. Scope of work includes new interior partition walls, and installing T-bar ceiling and lighting. Revision #2 to change the interior partition wall layout Architectural Schedule B submitted by Nicholas Waissbluth, Architect, AIBC, 604.612.5095 Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.