Building permit — Addition / Alteration · BP-2024-03280
Field Review - Addition / Alteration - #402 - 4th Floor (demised into #402 and #410) Interior alterations on the 4th floor to demise the existing office #402 into two units to be #402 and #410 in this existing commercial building on this site. Scope of work: Construct a demising wall to create 2 suites, demolish all non-load bearing walls, doors and return to shell the newly created suite #410, new sink, electrical and plumbing work to suit. Architectural Schedule B submitted by Nicholas Waissbluth, Architect, AIBC., 604.612.5095 Separate permit is required for future tenant improvement or to change the use in suite #410. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.