Building permit — Addition / Alteration · BP-2021-05237
Field Review - Addition / Alteration - CT Suite 4 - Interior alterations to CT Suite 4 on the ground floor at 899 W 12th Av (Jim Pattison Pavilion) in this existing Hospital building. Scope of Work includes: alterations to remove door, wall finishes, plumbing fixtures/piping/ducting, flooring, ceiling tiles, lighting, millwork and medical equipment; new finishes such as flooring, wall protection, ceiling tiles, light fixtures, new millwork, door, medical equipment, sink, piping, HVAC and fire stopping. Structural seismic support of new medical equipment. OK for field review as per J.Bal - Oct 7/21 Notes: ~ Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) ~ Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. No SP required per DBI. ~ Schedule A and Schedule B Architectural submitted by Patrick Yue, Architect AIBC of Bau Studio+ Architecture Inc., Tel: 778-688-7317. ~ Schedule B Structural submitted by Brett Halicki, P. Eng. of Bush, Bohlman & Partners LLP, Tel: 604 688-9861. ~ Schedule B Mechanical and Plumbing submitted by Sean Mac Aodh, P. Eng. of BES-Building Energy Solutions Ltd., Tel: 778.829.2441. ~ Schedule B Electrical submitted by Reuben James, P. Eng. of BES-Building Energy Solutions Ltd., Tel: 778.829.2441.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.