Building permit — Addition / Alteration · BP-2022-04421
Field Review - Addition / Alteration - 2nd, 3rd, 4th, 5th, 6th and 7th Floors Interior alterations to provide improvements to the existing common hallways on the 2nd, 3rd, 4th, 5th, 6th and 7th floors in this existing commercial building. Scope of work: Cosmetic upgrades; remove and replace/repair floors, walls, ceiling finishes, upgrade existing light fixtures and electrical work. REVISION #1: cosmetic upgrades including the removal of floor finishes. repair and polish existing concrete floors, demising walls to be brought to the underside of structure, ceiling finishes to be removed for exposed ceilings, upgrade existing light fixtures and electrical work, all low voltage cables to be put into attached cable trays and line voltage wiring into conduits. Remove an replace fire rated exit doors, and replace mechanical & washroom doors on floors 3, 6, & 7. - Change Electrical engineer. to Jad McDonald, P.Eng. Ph#604.687.1800.X2026. Aug. 28, 2023 mlh & mk Nov.30/23 Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Parisa Seyed-Hoseini, Architect AIBC, ph: 604-681-5050 Electrical Schedule B, Chris Fontaine, P. Eng., ph: 604-687-1800 (*SEE REV #1) E2 Upgrade - HVAC - Clean and Balance all Air Systems (per 6.7.2.3.2 of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.