Project · Public

Building permit — Addition / Alteration — 375 WATER STREET, Vancouver, BC V6B 5C6

Source: Vancouver — Issued permits — 2023-2025

Field Review - Addition / Alteration - #610 - 6th Floor Interior alterations to combine #610 and #620 (retaining #610) into an office shell space in this existing Municipally Designated Heritage B commercial building on this site.

Listed on FolioProjects
2026-11-27
Location
375 WATER STREET, Vancouver, BC V6B 5C6
Application number
BP-2024-00476
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:15:08.720906+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 04:54:05.39059+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2024-00476

Field Review - Addition / Alteration - #610 - 6th Floor Interior alterations to combine #610 and #620 (retaining #610) into an office shell space in this existing Municipally Designated Heritage B commercial building on this site. Scope of work: Remove the demising wall between the suites, and all non load bearing partition walls, millwork, fixtures, doors and frames to leave a shell space and some electrical and mechanical work. Letters of Assurance submitted by: Schedule A and Architectural Schedule B, P. Hoseini, AIBC. 604-681-5050 x102 Electrical Schedule B by Cameron Ballard, P.Eng., 604-347-9722 Mechanical and Plumbing Schedule B by James Y.P. Lee, P.Eng., 778-231-5278 Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).

Application address
375 WATER STREET, Vancouver, BC V6B 5C6
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 44600.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Office Uses

Specific use: General Office

Area: Downtown

Permit issued: 2024-04-19

Permit number created: 2024-02-09

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.