Building permit — Addition / Alteration · BP-2024-00476
Field Review - Addition / Alteration - #610 - 6th Floor Interior alterations to combine #610 and #620 (retaining #610) into an office shell space in this existing Municipally Designated Heritage B commercial building on this site. Scope of work: Remove the demising wall between the suites, and all non load bearing partition walls, millwork, fixtures, doors and frames to leave a shell space and some electrical and mechanical work. Letters of Assurance submitted by: Schedule A and Architectural Schedule B, P. Hoseini, AIBC. 604-681-5050 x102 Electrical Schedule B by Cameron Ballard, P.Eng., 604-347-9722 Mechanical and Plumbing Schedule B by James Y.P. Lee, P.Eng., 778-231-5278 Separate permit is required for future tenant improvement or to change the use. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.