Building permit — Addition / Alteration · BP-2024-04077
Field Review - Addition / Alteration - #1400 - 14th Floor (demise into 2) - See Revision #2 for the correct suites Interior alterations to the 14th floor to demise the existing office tenant space #1400 into two units to be #1420 and #1480 and to provide tenant improvements to both units in this existing commercial building on this site. Scope of Work: Construct a demising wall to create 2 suites, selective demo of existing construction, fixtures, millwork, electrical and plumbing work. * REVISION #1 - Change Mechanical Engineer to Stephen Kooiman, P.Eng. ph#04-298-4858. Dec.10/24 mk * Revision #2 - Reverting back the suite to #1400 instead of #1420 - per applicant request and per Addressing approval - Jan 17/25 - LLL OK for Field Review as per S.Yu on Oct 15, 2024 Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Sadaf Alerassoul, Architect, AIBC.,604.687.2990\t\t Electrical Schedule B by Chris Fontaine, P.Eng., 604.298.4858\t\t * Plumbing/Mechanical Schedule B by Reza Hessami, P. Eng., 604.298.485 (*SEE REVISION #1\t) Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.