Building permit — Addition / Alteration · BP-2026-02560
Field Review - Addition / Alteration - 21st floor - Elevator lobby and corridor Interior alterations to provide improvements to the existing elevator lobby and corridors on the 21st floor of this existing commercial building. Scope of Work: Updates to floor, wall finishes, drywall ceiling by the elevator door, electrical and sprinkler work to suit. Letters of Assurance submitted: \t\t Schedule A and Architectural Schedule B by Sadaf Alerassoul, Architect, AIBC., 604.687.2990\t\t Electrical Schedule B by Shabnam Shamsolkotabi, P.Eng., 604.609.0500\t\t Mechanical Schedule B by Joseph Braun, P.Eng., 604.608.6474\t\t Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2026 onward. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.