Building permit — Addition / Alteration · BP-2021-04543
Field Review - Addition / Alteration - #2400 - 24th Floor (full floor tenant)/Common Corridor Interior alterations to create a common corridor leading to washrooms and exit stairwells on the 24th floor (#2400). Scope of work: remove millwork and construct partition walls/doors/glazing for new common corridors. and electrical work TENANT: Osler Law Architectural Schedule B submitted by Miren Amaya Del Castillo, Architect, ph: 604-562-4617 Building Sprinklered - Building inspector to determine on site if a separate sprinkler permit is required. SP required as per DBI. OK for Field Review per K. Kang/D. Holbrook, Aug. 30, 2021 Energy upgrade E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.