Building permit — Addition / Alteration · BP-2026-01702
Field Review - Addition / Alteration - #2300 demising into two units / to be #2300 and #2350 Interior alterations to the 23rd floor to demise unit #2300 into two units, to be #2300 and #2350 in this existing commercial building on this site. Scope of work: remove a door and part of the corridor wall to relocate the entry door into #2300 and provide a new entry door for #2350. Electrical, Mechanical to suit. * District Building Inspector to determine if a Special Sprinkler Inspection is required. * Separate permit(s) will be required if further improvments to these spaces are needed. Letters of Assurance; - Schedule A and Architectural Schedule B by en G Wong AIBC, Architect. ph#604-899-4549. - Electrical Schedule B by Cameron Ballard, P.Eng. ph#604-609-0500 - Mechanical/Plumbing Schedule B by Joseph Braun. P.Eng. Ph#604-609-0500. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2026 onward. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.