Project · Public

Commercial / Multi / Industrial — 1200 Dufferin Crescent (ICU), Nanaimo

Source: City of Nanaimo — Planning, building, demolition and subdivision records

(ACUTE CARE - ICU) New construction of a 2 Storey addition with basement to the NRGH. Building Area 1021.3 m2, Group B2, constructed to 3.2.2.38. Fire Alarm System, Sprinklers GFA 2724.17 m2. F/S with 2 hour FRR between new addition and existing Hospital, and for Elevator shafts and stairwells. F/S with 1 hour FRR between wards on 3rd floor. F/S with 0 hour FRR between rooms on the 3rd floor. A separate building permit is required to develop the 2nd floor. Alternative Solution for Exit Exposure Protection. Sprinkler heads located at: Level G - Glazing on North Elevation; Level 1 - Glazing in future HAU on North and South Elevations; Level 2 - Glazing in ICU on North and South Elevations. 2023-JUN-13 REVISION: fitting out first floor previously identified as shell space, changing fire protection engineer of record, updating record drawings, building permit renewed 2024-SEP-13 REVISION: Change of fire suppression engineer, revised mechanical drawings.

Listed on FolioProjects
2026-11-13
Location
1200 Dufferin Crescent (ICU)
Application number
BP126677
Source-reported status
COMPLETED
Application date
2020-10-27

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Municipal application details

Commercial / Multi / Industrial · BP126677

(ACUTE CARE - ICU) New construction of a 2 Storey addition with basement to the NRGH. Building Area 1021.3 m2, Group B2, constructed to 3.2.2.38. Fire Alarm System, Sprinklers GFA 2724.17 m2. F/S with 2 hour FRR between new addition and existing Hospital, and for Elevator shafts and stairwells. F/S with 1 hour FRR between wards on 3rd floor. F/S with 0 hour FRR between rooms on the 3rd floor. A separate building permit is required to develop the 2nd floor. Alternative Solution for Exit Exposure Protection. Sprinkler heads located at: Level G - Glazing on North Elevation; Level 1 - Glazing in future HAU on North and South Elevations; Level 2 - Glazing in ICU on North and South Elevations. 2023-JUN-13 REVISION: fitting out first floor previously identified as shell space, changing fire protection engineer of record, updating record drawings, building permit renewed 2024-SEP-13 REVISION: Change of fire suppression engineer, revised mechanical drawings.

Application address
1200 Dufferin Crescent (ICU)
Source-reported status
COMPLETED
Application submitted
Issued date
Source final date
Source expiry date

Other addresses listed in this application: 1200 DUFFERIN CRESCENT.

Source: City of Nanaimo — Planning, building, demolition and subdivision records.

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

Applications sharing a municipal address

These applications share an address listed by the municipality. They remain separate records; this does not confirm that they are phases of one development.

Showing a limited selection of address matches. Search the application address for more records.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

About this project

Commercial / Multi / Industrial · BP126677
(ACUTE CARE - ICU) New construction of a 2 Storey addition with basement to the NRGH. Building Area 1021.3 m2, Group B2, constructed to 3.2.2.38. Fire Alarm System, Sprinklers GFA 2724.17 m2. F/S with 2 hour FRR between new addition and existing Hospital, and for Elevator shafts and stairwells. F/S with 1 hour FRR between wards on 3rd floor. F/S with 0 hour FRR between rooms on the 3rd floor. A separate building permit is required to develop the 2nd floor. Alternative Solution for Exit Exposure Protection. Sprinkler heads located at: Level G - Glazing on North Elevation; Level 1 - Glazing in future HAU on North and South Elevations; Level 2 - Glazing in ICU on North and South Elevations. 2023-JUN-13 REVISION: fitting out first floor previously identified as shell space, changing fire protection engineer of record, updating record drawings, building permit renewed 2024-SEP-13 REVISION: Change of fire suppression engineer, revised mechanical drawings.
Source-reported status: COMPLETED. Application status does not establish construction activity or completion.
Application date: 2020-10-27.
Permit issue date: 2021-01-06.
Source final date: 2025-08-26.
Source expiry date: 2025-01-06.
Addresses listed by the municipality: 1200 DUFFERIN CRESCENT. These are source-listed associations, not a verified parcel history.
Municipal application source
City of Nanaimo, What's Building public application CSV. The City is the data source, not necessarily the project owner. This profile is not managed or endorsed by the City.
Source data licence and terms of use
The municipality lists different civic and associated-property addresses. They are retained as source evidence, not verified parcel equivalence.

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

Feedback totals are unavailable.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.