heat pump installation. did a load calculation with addition of new heat pump, which results in a total load of just over 110A on their 200A FP panel ran power for 25A heat pump using 10/2 romex, junctioned to 10/2 teck in crawl space. - 1/2” liquid tight whip run from disco - surge protector connected in parallel with line side Used proper wet connect for teck wire at disco - deleted old furnace feed and tied through their on demand hot water system to a receptacle from old furnace switch. -proper voltage was measured at the disco as was the panel schedule to reflect the new heat pump and deletion of furnace.
Application address
2815 PRIOR ST
Source-reported status
EXPIRED
Source record created
Issued date
Source final date
Source: Victoria — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – City of Victoria.
These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.
About this project
Permit value (CAD): 500.00
Permit issued: 2024-08-21
HueFlux feedback
Recorded project feedback. These responses do not establish property condition or represent the whole community.
Essential cookies keep FolioProjects working. With your permission, Mouseflow records visits to selected public marketing pages. Recording is disabled when you are signed in and on private pages.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.