Project · Public

Electrical Permit (EP) — 147 GOVERNMENT ST, Victoria

Source: Victoria — Issued permits — 2023-2025

Bathroom and kitchen renovation ADDED JUNE 3, 2025: Current service is 200A / single phase.

Listed on FolioProjects
2026-11-27
Location
147 GOVERNMENT ST
Application number
EP081187
Source-reported status
COMPLETED

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Victoria — Issued permits — 2023-2025 · Last checked 2026-11-27T06:20:22.828671+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – City of Victoria. Licence

Summary totals updated 2026-11-27 07:01:14.174667+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Electrical Permit (EP) · EP081187

Bathroom and kitchen renovation ADDED JUNE 3, 2025: Current service is 200A / single phase. Decommission current service. Install: 2 single 200A meter bases (A and B) side by side on exterior wall; 2 service masts to feed new meter bases overhead from BC Hydro transformer; 1 common point of attachment 6m above grade on mast; 1 plate ground electrode and ground each new meter base at neutral using #6 cu conductor. Bond each meter base housing by looping ground conductor through neutral ground lug. From meter A feed existing 200A panel in newly created suite with 3/0 TECK cable. Install new 200A panel in main house and feed from meter B using 250kcmil ACWU cable. Bond each service feeder armoured cable on meter side using bonding bushing. Remove bonding strap in each 200A panel and bond each panel housing using bare conductor of feeder cables. Separate existing wiring so the 2 newly created dwelling units is electrically independent

Application address
147 GOVERNMENT ST
Source-reported status
COMPLETED
Source record created
Issued date
Source final date

Source: Victoria — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – City of Victoria.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 8800.00

Permit issued: 2025-03-20

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.