Building permit — Addition / Alteration · DB-2023-03325
Low Density Housing - Addition / Alteration - Exterior and interior alterations to change the use from Single Detached House to Single Detached House with Secondary Suite. - legalize the suite in the basement and remove the interconnecting staircase from the basement to Main floor - reconfigure the interior layout on the main and upper floor - minor window changes - including reduce the window opening facing the side yard. - change the two overhead doors to one overhead door (17' wide) in the detached two-car garage. -Repair existing roof; Add new roofing and drywall REVISION #1: - To update the drawings to reflect the added work to the roof. - To update the site plan to correctly show the sitting of the building and firefighter access. - To provide assembly details showing non-combustible insulation for side yard less than 1.2m. - To update the REUP form to reflect the scope of work per the drawings. B. Wong - Jul 8/24 Revision #2: - To update the suite separation: To retain the existing assembly B. Wong - Aug 1/25 This building is not sprinklered. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.