Building permit — Addition / Alteration · DB-2021-05798
Field Review - Addition / Alteration - Interior and exterior alterations to provide tenant improvements for this existing retail tenant in this existing commercial building. Scope of Work: Installing racking, reconfiguring the entire interior, partial removal of exterior canopies and alterations to the exterior glazing and cladding. OK for Field Review as per J.Bal - Nov 9/21 Ok'd by POD - M Linehan, Nov 9/21 REVISION #1: - Layout, partition and lighting changes to accommodate the new location of the washrooms due to site conditions. - Ceiling added to the exit corridor of the stock room area. - Exit signs and fire alarm devices relocated to accommodate layout changes. - New guardrail connection changed to match existing guardrails. B. Wong - August 12/22 Notes: - This building is sprinklered. A separate sprinkler permit is required for all related work. - Energy Upgrade: E2 - Retrofit Path: 1 @ E2 - Schedule A & Schedule B (Architectural), Richard Witt, Architect, 416-589-1240 - Schedule B (Structural), Ramin Papaei, P.Eng, 604-738-0048 - Schedule B (Structural - storage racking), B Hanson, P.Eng, 509-921-7731 - Schedule B (Mechanical/Plumbing), Qing Ping Zhang, P.Eng, 905-946-4260 - Schedule B (Electrical), Zhao Hui Guo, P.Eng, 905-946-4260 - Schedule D, Richard Witt, Architect, 416-589-1240 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.