Building permit — Addition / Alteration · BP-2021-04813
Field Review - Addition / Alteration - #803 Interior alterations to provide improvements to this rental unit on the 8th floor (#803) in this existing multiple dwelling building on this site, Upgrade bathroom and Modify the kitchen layout, upgrade finishes, appliances, and fixtures throughout the suite, and to fix firestopping where needed OK For Field Review per Andrew W - Sept 13/21 Letter of assurance provided by: John J. McCuaig, 604-255-0992, Schedule B (Architectural, Plumbing, Electrical) Note: - DBI to determine on site whether Structural drawings and schedule B are required - The energy option for this unit is E2-Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher). Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.\t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t \t\t\t\t\t\t\t\t\t\t
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.