Building permit — Addition / Alteration · DB-2022-05236
Field Review - Addition / Alteration - Jim Pattison Pavilion North - Basement Exterior and interior alterations to provide improvements for a chiller expansion, medical gas upgrade and extension of existing anesthetic gas scavenging system to Biomedical Engineering workrooms in the basement level of this existing hospital building on this site. REVISION#1 - add to scope - expand area of work. - add Carbon Dioxide (C02) tank room; relocation and expansion of C02 system manifold. - correct error on Arch Drwgs cover page; add missing Med Gas Upgrade are of work. - add construction assemblies & door schedule. - update structural, electrical, mechanical/plumbing. - Increase project value from $5,000,000.00 to $5,290,000.00 Rev #2: Amendment for: new enclosure in CO2 tank room with sprinklers, shaft walls around CO2 pressure relief piping, intake air duct & fan, new breakers in existing UPS panel, relocation of electrical panels, relocation of harmonic filters and pads, new emergency push buttons, rerouting AGS piping, etc. Extra $4.2mil OK for DB per B. Duffix OK for Field Review per W. Wong Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Gek Mei Tan, Architect AIBC, ph: 604-669-7710 Structural Schedule B, Thomas Pogorzelec, P.Eng., ph: 604-688-9861 Mechanical and Plumbing Schedule B, Alireza Khaleghi, P.Eng., ph: 604-696-8000 Electrical Schedule B, Gordon R. Thomson, P.Eng., ph: 604-685-9381 Energy Exempt: Equipment Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.