Building permit — Addition / Alteration · BP-2021-05251
Field Review - Addition / Alteration - #302 Interior alterations to install new 15A Power for microwave and kitchen floor heating. To install new kitchen pot lights and relocate receptacle plug in suite #302 on the 3rd floor of this existing multiple dwelling building. Energy upgrade: E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. EP req'd. No SP req'd per District Building Inspector. Okay for field review as per K. Kang Oct. 8, 2021
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.