Building permit — Addition / Alteration · BP-2023-03270
Field Review - Addition / Alteration - Exterior and interior alterations to provide improvements to the single detached house with secondary suite building on this site. Exterior work to remove chimney. Scope of work: - Install interior walls and change existing doors to sliding doors throughout, replace front door, remove chimney and install one skylight, new sink & W/D, new gas fireplace, and electrical work. Rev #1 - Upgrade window, door headers, shear walls, truss, joists & add 17'3" beam & new footing as required by Engineer - Insulate/vapor seal original walls (25%) to R14 maintain stud depth - Update upper main & lower floor bathroom with new fixtures - Install ERV (see REUP) hydronic forced air heating Lower suite - relocate W/D and mechanical room, update bathroom layout, add dining area, electrical & plumbing work - Upgrade main and suite kitchen drainage from iron to new in-slab sanitary line - Increase construction cost of 80,000.00 - REUP submitted per Tommy Youngsung Byun, 604-562-0387, [email protected] - New Schedule B Structural - Min Park, P.Eng - 778-836-7221, [email protected] OK for Field Review per W.Wong
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.