Building permit — Addition / Alteration · BP-2022-04493
Field Review - Addition / Alteration - 9th floor ONLY- elevator lobby and common washrooms Interior alterations to provide improvements to the 9th floor elevator lobby in this existing commercial building on this site. Scope of work: remove and repair/replace finishes to the elevator lobby and washrooms. DBI notes: Update to lever at existing doors to the washrooms/any vertical plumbing or raceway new or existing will required a ULC listed fire stop assembly/Framing inspection will be required. Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Danny Ka Wai Wong, Architect, ph: 604-773-2068 Mechanical and Plumbing Schedule B, Mr. Kai Chen, P.Eng., LEED AP, ph: 604-687-1800 Electrical Schedule B, Mr. Jose Luis Lopez, P.Eng., ph: 604-687-1800 E2 Upgrade -Lighting #8- Upgrade to Incorporate Automatic Full OFF (per.9.4.1.1 (h) of ASHRAE 90.1-2026) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.