Building permit — Addition / Alteration · BP-2022-01575
Field Review - Addition / Alteration - Roof Patio Exit Upgrade. Upgrading the exit doors to be code compliant and putting new push to exit emergency bar connected to the existing electrical strike and fire alarm. Upgrading exit lighting and emergency lighting and partial re-verification of fire alarm system. Letters of assurance submitted by: Sonia Mollaei, P.Eng, 778-833-0908, Electrical Schedule B, Barry McGinn, Reg. Arch. Architectural Schedule B, Schedule A, 604-473-9866. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.