Building permit — Addition / Alteration · BP-2022-01148
Field Review - Addition / Alteration - #1100 - 10th Floor (full floor) *see Rev #1 Interior alterations to combine #1002 (south portion of the 10th floor) and #1100 (north portion of the 10th floor) into one full floor tenant retaining #1100. Scope: remove partition walls, doors, millwork, construct new demountable partition walls, electrical and sprinkler work. NOTE: 10th - 12th floors are interconnected by an internal stairway and are one unit (#1100) REVISION #1: minor layout changes, addition of a coat closet at the suite exit at the south side, change the original permit applicant from Francois Moore, Axiom Builders Inc., to new Applicant Alexis Prokopuik, Axiom Builders Inc. and increase project value from $300,000.00 to $302,000.00 Also, unit number changed from previous #1002 to #1100 for entire 10th floor. Jan. 3, 2023 mlh TENANT: Jameson House Ventures LTD OK for Field Review per k. Vogt March 3, 2022 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: 1 @ E2\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.