Project · Public

Building permit — Addition / Alteration — 800 BURRARD STREET, Vancouver, BC V6Z 2G7

Source: Vancouver — Issued permits — 2023-2025

Field Review - Addition / Alteration - #1300 - 13th Floor (full floor) Interior alterations to provide tenant improvement to this existing office tenant on the 13th floor (#1300) of this existing commercial building on site.

Listed on FolioProjects
2026-11-27
Location
800 BURRARD STREET, Vancouver, BC V6Z 2G7
Application number
BP-2023-02317
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:05:06.964571+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:26:24.01848+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2023-02317

Field Review - Addition / Alteration - #1300 - 13th Floor (full floor) Interior alterations to provide tenant improvement to this existing office tenant on the 13th floor (#1300) of this existing commercial building on site. Scope of work: Demolish a wall separating control room and vestibule, remove a portion of a wall to provide an opening between the control room and the computer room, demolish existing millwork. Construct new furred wall, new card reader on entrance door and electrical work. REVISION #1: To add new doors and frosted security film to existing windows, remove furred wall and insulation in the corridor, proposed electrical, mechanical work and equipment from scope of work. Also change in Mechanical Engineer to Alula Yadete - Aug 9/24 - LLL TENANT: Shared Services Canada Letters of Assurance submitted: Schedule A and Architectural Schedule B by James Emery, Architect, AIBC., 604.736.5581 Electrical Schedule B by Boban Ratkovicm P.Eng., 604.817.7236 Plumbing/Mechanical Schedule B by Alula Yadete, P.Eng., 778.939.1907 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).

Application address
800 BURRARD STREET, Vancouver, BC V6Z 2G7
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 412400.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Office Uses

Specific use: General Office

Area: Downtown

Permit issued: 2023-08-15

Permit number created: 2023-06-30

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.