Building permit — Addition / Alteration · BP-2022-03503
Field Review - Addition / Alteration - Interior alterations to provide improvements for a new Retail (Limited Food Service) on the ground floor at the Northeast corner of Retail Store (Nordstrom) on the site. New Tenant: Milk Bar OK for Field Review per W.Wong, July 11, 2022 Notes: - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Energy Upgrade: 1. E2 - SWH - Upgrade SWH system Temperature Maintenance Controls (per 7.4.4.2 of ASHRAE 90.1-2016). 2. E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016). - Schedule A and B, Architectural, Robert Salikan, Architect, 604-688-0100. - Schedule B, Structural, Arvind Nerurkar, P.Eng, 206-623-0717. - Schedule B, Plumbing, Brian Haugk, P.Eng, 206-448-3376. - Schedule B, Electrical, Robert Olson, P.Eng, 206-448-3376. Class 5 Cooking (No Hood): 1. Class 5 Cooking Operations (No Hood): 2. Appliances are less than or equal to 6 kW (Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted). Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.