Building permit — New Building · BP-2019-04316
Certified Professional Program - New Building - To construct eighteen (18) 3-storey side-by-side townhouse units with basement (three row buildings) on top of a one-level underground storage garage having vehicular access from a Lane. The storage garage will be designed as separate building per 3.2.1.2. Building 3 (West Building) will have a 1-h fire separation at GL 2.5 to be considered as separate buildings per Div. A 1.3.3.4. for building height determination. This permit has been reviewed under the 2014 Vancouver Building By-law (#10908). Storage Garage to be sprinklered to NFPA 13 requirements. Townhouse units to be sprinklered to NFPA 13R requirements. STAGED CONSTRUCTION Stage 1: Excavation & Shoring. June 2, 2021. B. Smith REVISION #1 (June 4/21. B, Smith): Excavation & Shoring plans have been amended to match changes on proposed DPMA (DP-2020-00674), at the West side of this site. Stage 2: Full Structural to Roof. July 19th, 2021. S.Le for B.Smith Stage 3: Full Construction - issued May 13, 2022 ***CONDITIONAL APPROVAL - An Alternative Solution shall be submitted and accepted by the Chief Building Official to resolve the provisions of Article 3.3.4.2.(3) relating to suites exceeding 6 m between the lowest floor level and the uppermost floor level within the dwelling unit prior to the occupancy of any suites so affected.*** Rev #2: Change of electrical engineer of record: Shabnam Shamsokotabi replaced Mike Shefreie, as of June 17th, 2022.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.