Building permit — New Building · DB-2026-02346
Low Density Housing - New Building - To construct a 2-storey laneway house building ($665,000.00) with an attached carport, providing a total of 3 parking spaces, having vehicular access from the 20' rear lane. 1.\tCovenant not required with existing house 2.\tNo Strata Titling permitted 3.\tMechanical unit proposed – Exterior component located in the rear of the LWH next to the lane, Interior component located on the main floor mech closet. 4.\tSchedule B: Adeel Ahmed P Eng 604-579-0110 for structural 5. Schedule B: PK Linda Fong P Eng 604-837-3205 for geotechnical 6.\tHPO: Residential Builder - Smallworks Studios and Laneway Housing Inc #31906 6. Owner's responsibility to comply with BC Hydro’s guide to utility clearance requirements. See the submitted signed Declaration form. Note: The entire building to be sprinklered to NFPA 13D with the attached carport to be sprinklered with the provision in Sentence 9.10.15.4.(11) in VBBL 2025 Note: This is a 2-storey building pursuant to the Zoning & Development By-law. *This permit is issued under the 2025 Vancouver Building By-law #14343 effective September 15, 2025* Addressing information: BUILDING 2 #3-746 E 27th Av - Laneway House (2 storey) Address and suite number assigned as per approved plans for Fire and Emergency response. The address number is to be posted to the building to be visible from the street and the suite number is to be posted at the suite entry in accordance with the Building By-law prior to final inspection. Note: As a result of the addition of a laneway house, the main house / principal dwelling will be assigned a suite number and the site will be as follows: #1-746 E 27th Av - Principal Dwelling
Source: Vancouver — Issued permits — 2026 onward. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.