Project · Public

Building permit — Addition / Alteration — 733 SEYMOUR STREET, Vancouver, BC V6B 5J3

Source: Vancouver — Issued permits — 2023-2025

Field Review - Addition / Alteration - #1300 - 13th floor AND #1400 - 14th floor (demising from #800 for 7th to 4th flrs) Interior alterations to demise and provide improvements for a new office tenant on the 13th and 14th floor (#1300 &…

Listed on FolioProjects
2026-11-27
Location
733 SEYMOUR STREET, Vancouver, BC V6B 5J3
Application number
BP-2025-02792
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:40:37.618129+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:27:20.047286+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2025-02792

Field Review - Addition / Alteration - #1300 - 13th floor AND #1400 - 14th floor (demising from #800 for 7th to 4th flrs) Interior alterations to demise and provide improvements for a new office tenant on the 13th and 14th floor (#1300 & #1400) of this existing commercial building on this site. Scope of work: DEMISING EXISTING SUITE #800 INTO 2 UNITS (LEVELS 7-12 #800 AND LEVELS 13-14 #1300 &#1400) . Interior demo and construction of partition walls, door/frames, ceiling, millwork, finishes for new layout. Electrical, Mech/Plumbing, Sprinklers to suit. REVISION #1- removal of two Elevator Lobby glass doors (with mag locks and card reader access) on both levels. Revised door handles on level 14. Jan 30/25mk Ok for Field Review per Olive Luo. Tenant: ATKINS REALIS IS SUB-LEASING LEVELS 13 TO 14 flrs Letters of Assurance: - Schedule A and Architectural Schedule B by; Tony Gill, Architect, AIBC. ph#604-377-2477. - Electrical Schedule B by - Alexander Gonzales, P.Eng. ph#604-250-7847 - Mechanical Schedule B by - Vincent Siu P.Eng. ph #604-662-3555 (52096) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.

Application address
733 SEYMOUR STREET, Vancouver, BC V6B 5J3
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 300000.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Office Uses

Specific use: General Office

Area: Downtown

Permit issued: 2025-07-16

Permit number created: 2025-06-20

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.