Building permit — Addition / Alteration · DB-2021-05981
Field Review - Addition / Alteration - #130 - ground floor Interior alterations to change the use from Retail to General Office in this unit #130 on the ground floor of this existing mixed use building on this site. Scope of work: - Install interior walls, doors, new universal washroom, T-bar ceiling, lighting, plumbing fixtures and flooring. Revision #1 - Addition of Electrical and Mechanical drawings to permit. - Schedule A & Schedule B Mechanical submitted as per Satwinder Pal Singh, P.Eng, 604-564-6800 [email protected] - Schedule B Electrical submitted as per by Shivjeet Sidhu, P.Eng, 604-724-0701 [email protected] Revision #2 - To provide minor layout changes to the Office Rooms, Reception, Foyer, and Pantry, and the sink is relocated to avoid the coring of the concrete floor slab - Moving the receptacles and wall outlets to suite new layout. Lighting layout is changed to suit the revised interior layout (E1) - HVAC layout is changed to suit the revised interior layout (M1) B.Wong - Sep 9/22 Revision #3: - To change the interior wall layout throughout. - To change the ceiling and lighting throughout to coordinate with wall changes. B.Wong - July 6/23 OK for field review as per Jamie Zhang, Oct.16/21 OK for DB per David Cha Schedule B Structural submitted per Koosha Kheradmandnia, 778-979-7100 Energy Upgrade Exempt: 1st TI Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.