Building permit — Addition / Alteration · BP-2019-01782
Certified Professional Program - Addition / Alteration - To construct a new pavilion addition, retail shell only, to replace existing Pacific Center Mall rotunda. New construction includes: 1. Main mall entrance, canopy and interior corridor fronting on West Georgia Street, connecting to the new retail addition and existing mall circulation. 2. New canopy over the existing Howe Street entrance to the lower mall concourse. 3. New plaza and landscape. This work is considered Major Vertical Addition applied as Self-Contained Separated Space from the remainder of Pacific Centre at W Georgia Street level. A 2-hour fire separation between addition and existing building provided by fire rated shutter. Upgrades of S4 and N4 are required for the below grade structural frame work, to support the new retail addition and egress, to an area within the general vicinity of the project area as defined in Architectural drawings. Proposed upgrades were discussed and accepted by CBO Office. Separate tenant improvement permits are required for all shell tenant spaces. This permit has been reviewed under the 2014 Vancouver Building By-law (#10908). Reviewed during the 2020 pandemic crisis. NOTE: Partial Deconstruction Permit (BP-2020-00528) must be issued prior to construction of above grade structure. STAGED CONSTRUCTION Stage 1 - Below Grade Enabling Work (issued February 20, 2020) Stage 2 - Full BP (issued June 19, 2020) Revision 1 - Modified Structural Seismic Approach and associated revisions to project scope. See revision summary for details of changes in revised drawings (issued February 15, 2021) Revision 2 - Change Addressing from #G064 to #G061 - issued April 27, 2022
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.