Building permit — Addition / Alteration · DB-2021-06115
Low Density Housing - Addition / Alteration - Professional Design and Review under VBBL *PART 5* Design principle for:- Exterior alterations to validate a new mechanical/storage room addition (approx. 245 sq. ft.), an unvented roof/deck over, new patio with a hot tub, remove existing stucco, install new rainscreen and Hardie board siding, windows removed and replaced; interior alterations to relocate the bathroom and change the layout on the 1st (lower) floor of this existing two storey, one family dwelling building with a carport at the rear having vehicular access from the lane. Schedule B Architectural, Schedule B Structural and Schedule D1 Building Envelope submitted by Jason Hui, P. Eng. of Vancouver Engineering & Consulting Ltd., Tel: 778 319 3403. Building depth and Rear yard relaxation granted with letters of support received from adjacent neighbors per Hamid Shavan, Development Planner. Notes: ~ Energy Upgrade: As per REUP ~ VBBL, Part 11 classification - minor renovation, upgraded as per Table 11.2.1.4.(1)-A, -B and -C. ~ Hot tub installation requires a separate Plumbing permit and the gates and fence shall comply with VBBL, Sub Section 9.8.8. Guards. ~ Windows located in the side yard (north and south elevation) removed and replaced with safety glass - no change to window size or window location. ~ Interconnected, hardwired, 120 volt smoke alarms with battery back-up, silencing feature and with carbon monoxide detector to be installed in the entire building as per VBBL, Subsection 9.10.19. and Article 9.32.4.2. ~ This permit has been issued under VBBL 2019.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.