Building permit — Addition / Alteration · BP-2021-06478
Field Review - Addition / Alteration - #303 - 3rd floor Interior alterations to provide a first tenant improvement for a new office tenant on the 3rd floor (#303) in this existing mixed use building on this site. Scope of work: new workstations, boardroom with wood slat wall, staff kitchen, existing suite entry door replaced with new glass door, second suite door removed, new lighting, HVAC, electrical, plumbing, mechanical and sprinkler work. Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Sengsack Tsoi, Architect, ph: 604-780-7429 Mechanical and Plumbing Schedule B, Charles W. Powell, P.Eng., ph: 604-595-4869 Electrical Schedule B, Guowei Wang, P.Eng., ph: 604-626-2930 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. OK for field review per K. Kang December 9, 2021 Energy upgrade exempt for 1st TI Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.