Building permit — Addition / Alteration · BP-2022-01022
Field Review - Addition / Alteration - #701 - 6th Floor Interior alterations to provide improvements to unit #701 on the 6th floor in this existing multiple dwelling building on site. Scope of work: Remove a partition wall between the kitchen, hallway and pantry, replace bathroom fixtures, new cabinetry, construct new partition wall to the side of the fridge, electrical and plumbing work to suit. REVISION #1: Change in contractor on the permit from Tyto Construction TO Wood Green Construction. September 6/22 - LLL OK for Field Review per K. Vogt - Feb 25/22 (Enclosed balcony approved per Andrew W - Mar 10/22) The services of a Structural Engineer may be required, based upon site inspection by the District Building Inspector. E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stag
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.