Building permit — Addition / Alteration · BP-2024-02480
Field Review - Addition / Alteration - Interior alterations to change the use from Wholesaling to Information Communication Technology Manufacturing with ancillary Office for a new tenant in this existing commercial building (Building 2) on this site. Sch A/B - Arch - James Wu AIBC - 604-337-1702 Sch B - Struc - Doug Birch P.Eng - 604-294-6662 Sch B - Mech - Charles Powell P.Eng - 604-595-4869 Sch B - Elec - Blake Shine, P.Eng - 604-346-5131 Building is sprinklered Energy Checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade permits. (e.g. electrical and plumbing). It is the applicant's responsibility to identify and note all required upgrades on their BP drawings at the BP stage. Heat pumps must be rated no higher than 60 dB(A). It is the responsibility of the owner and the licensed contractor to ensure heat pumps are specified and sited to minimize the sound level transmission along property lines as required by the Noise Control Bylaw #6555.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.