Building permit — Addition / Alteration · BP-2025-01419
Field Review - Addition / Alteration - Interior alteration to return this existing financial institution to shell condition at unit U-4 on the ground floor of this existing commercial building. Scope of work includes demolition of existing interior partitions, ceilings, kitchenette, washroom fixtures, ceilings, millwork, electrical wiring back to source and existing lighting. Modifications to exits signs, lights, sprinklers, fire alarm and HVAC to suit empty space. OK for field review per I. Mackie Mar 25th, 2025 Schedule A: Harrison Chan - 416.961.4111 Schedule B Architectural: Harrison Chan - 416.961.4111 Schedule B Electrical: Andrew Charnock, P. Eng. - 604.404.2325 Schedule B Mechanical: Sean A O'Sullivan P. Eng. - 604.358.9773 Note: This suite will require future tenant improvements prior to occupancy. This building is sprinklered. A separate sprinkler permit is required for all related work No translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows so that the interior of the premises is visible at all times from the sidewalk Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade’s permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.