Building permit — Addition / Alteration · BP-2022-04842
Field Review - Addition / Alteration - #2800 - 28th Floor Interior alterations to remove all non loadbearing partitions and finishes on the 28th floor (#2800) and return to office 'vacant' space in this existing commercial building. Scope of work: Demolish all partition walls, existing floorings, millwork, plumbing fixtures, remove entry door, t-bar ceiling. Install new lighting and finishes, electrical, plumbing and sprinkler work. OK for Field Review for interior demolition Separate permit(s) and ASHRAE checklist will be required for future tenant improvements. E2 - Lighting - Upgrade to Bilevel Lighting Control (per 9.4.1.1.(d) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.