Building permit — Addition / Alteration · BP-2021-00157
Field Review - Addition / Alteration - interior alterations to the existing Sales center office (D - Small suite) at 5864 Cambie St on the 1st storey in this existing one storey commercial building (Building 2) on this site. Scope of work includes: alterations to remove display suite at rear; new partition dividing the rear into two - corridor linking the front office area to the washroom/exit at back of house and rear display suite area; new doors. No proposed work in front office area. Rev #1 (R. Foster) issued March 30, 2021 to install display suite at rear - new walls and doors, mock kitchen and bathroom and install storage closets in rear corridor - all pages replaced. ~ New Electrical drawings and Schedule B Electrical submitted by Steven Nemetz, P. Eng. of Nemetz (S/A) & Associates Ltd., Tel: 604 736-6562. ~ Energy Upgrade: E2 - Lighting - Upgrade to incorporate Scheduled Shutoff (per 9.4.1.1.(i) of ASHRAE 90.1-2016). Tenant: Pure Presentation Center. Note: All kitchen appliances are to remain non-operable for display only, and the space is not to be used as dwelling. OK For Field Review per A. Campbell, Jan 15, 2021. Notes: ~ Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) ~ Building Not Sprinklered – No sprinkler permit required. ~ Schedule A and Schedule B Architectural submitted by Paul Goodwin, Architect, AIBC of GBL Architects Inc., Tel: 604 736-1156.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.