Building permit — New Building — 585 W 29TH AVENUE, Vancouver, BC V5Z 2H8

Source: Vancouver — Issued permits — 2023-2025

Certified Professional Program - New Building - To construct a 3-storey Passive House multiple dwelling building with 6 dwelling units with a direct entry from ground level, over one level of underground parking, having vehicular access…

Listed on FolioProjects
2026-11-27
Location
585 W 29TH AVENUE, Vancouver, BC V5Z 2H8
Application number
BP-2022-01744
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T03:50:21.356033+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:26:11.360131+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — New Building · BP-2022-01744

Certified Professional Program - New Building - To construct a 3-storey Passive House multiple dwelling building with 6 dwelling units with a direct entry from ground level, over one level of underground parking, having vehicular access from the rear lane. This is a CP Process Permit and the applicant is Ron Bijok, MAIBC, CP. ***REVIEWED UNDER VBBL 2019 WITH AMENTMENTS EFFECTIVE ON JUN 30, 2022*** This building qualifies as Part 9 under the VBBL but has been evaluated under Part 3 as required by the CP Program. Applied Part 9 provisions are VBBL 9.10.9.4.(2), 9.9.9.1.(1), and 9.10.4. Building to be sprinklered to NFPA 13 in the parkade and residential occupancy to NFPA 13R. STAGED CONSTRUCTION Stage 1: Excavation & Shoring and Foundation/Structure to Grade (Sep 29/23, by A. Min) Stage 2: Full Construction (Jul 12/24, by A. Min) related to DPMA DP-2024-00067 REVISION #1 (Oct 03/25, by A. Min): - Changed Mechanical & Plumbing Engineer from Geoffrey Chiu, P. Eng. to Angela Wang, P. Eng. as of Mar 15, 2025. - Reflected Fire Suppression Engineer Changes: from Terence Chang Paul Wang, P. Eng. to Min Gao, P. Eng. as of Oct 25, 2023; from Min Gao, P. Eng. to Geoffrey Chiu, P. Eng. as of May 03, 2024; and from Geoffrey Chiu, P. Eng. to Peter Shires, P. L. Eng. as of Mar 15, 2025. REVISION #2 (Dec 11/25, by A. Min): Related to DPMA DP-2025-00759 - Revised finish grades at north side at garbage and exit stair area. - 4460 Ash St: Added entrance closet on Level 1, changed Level 3 closet & ensuite layout, and removed of north window on Level 3. - 585 & 595 W 29th Av: Resized the south window/door on Level 1, added raised platform closet on Level 3, and changed roof deck layout. - Updated exterior wall and roof assemblies and details. REVISION #3 (Feb 12/26, by A. Min): - Change of Fire Suppression Engineer from Peter Shires, P. L. Eng. to Jorge Lopez, P. Eng. as of Nov 11, 2025. - Changes to Fire Suppression Drawing Changes in its Final Design Drawings by the incoming FS EOR.

Application address
585 W 29TH AVENUE, Vancouver, BC V5Z 2H8
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 4600000.00

Type of work: New Building

Property use: Dwelling Uses

Specific use: Multiple Dwelling

Area: South Cambie

Permit issued: 2024-07-12

Permit number created: 2022-04-04

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.