Building permit — Addition / Alteration · BP-2021-04961
Field Review - Addition / Alteration - #201 - 2nd floor (full floor tenant) Interior alterations to provide tenant improvements for a new full floor office tenant on the 2nd floor (#201) in this existing commercial building. Scope of work: structural upgrade to one concrete beam, remove/construct new partitions, doors, new server room with new clear and sealed windows to align and match with the existing exterior windows, mechanical, electrical and sprinklers work REVISION #1 - revision to withdraw previous structural notes. New equipment is not exceeding design allowance. Upgrade not required. Structural letter and diagram submitted by Min Park, P.Eng. Ph#604.836.7221. Exterior alterations cleared by Michele Alborg, POD; Dec. 6, 2021 TENANT: HCL Canada, Inc Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Robert H. Lee, Architect AIBC, ph: 604-420-2233 Structural Schedule B, by Min Park, P.Eng. Ph# 778.836.7221. Mechanical and Plumbing Schedule B, John Makepeace, P.Eng., ph: 604-538-0764 Electrical Schedule B, Philip O'Neil, P.Eng., ph: 236-999-9601 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. SP req'd per DBI. OK for Field Review per K. Vogt - Sept 21, 2021 E2 - Lighting -Upgrade to incorporate Scheduled Shutoff (per 9.4.1.1 (i) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.