Building permit — Addition / Alteration · BP-2023-01971
Field Review - Addition / Alteration - #800 Interior alterations to provide improvements for a new School - University or College tenant at unit #800 on the 8th floor of this commercial building on this site. OK for Field Review as per R.Rattray Tenant: Alexander College Letter of assurance provided by: Schedule A & B (Architectural): Kevin Hanvey, B.Arch, Architect AIBC, 604-632-3350 Schedule B (Electrical): Ryan Blaney, P.Eng., 604-632-3350 Schedule B (Mechanical/Plumbing): Zhe Jia (Jack) Zhang, P.Eng., 604-632-3350 Note: - Building is sprinkelered - Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during the inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. Revision #1 To Update several office layout, Update ceiling layout, Update drawings and schedules to match with the alteration/changes Revision #2: Change of electrical Engineer from Alex Riftin, P.Eng., to Ryan Blaney P.Eng
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.