Project · Public

Building permit — Addition / Alteration — 5595 MACKENZIE STREET, Vancouver, BC V6N 1H1

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

High Density Housing / Commercial - Addition / Alteration - To alter and relocate the existing One-Family Dwelling residential building (Building 2) to the rear of the site and to construct a 3-storey Infill Multiple Dwelling residential…

Listed on FolioProjects
2026-11-28
Location
5595 MACKENZIE STREET, Vancouver, BC V6N 1H1
Application number
BP-2022-00256
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:35:36.441667+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:44:08.933022+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2022-00256

High Density Housing / Commercial - Addition / Alteration - To alter and relocate the existing One-Family Dwelling residential building (Building 2) to the rear of the site and to construct a 3-storey Infill Multiple Dwelling residential building containing three dwelling units with an attached 3-car garage (Building 1), having vehicular access from Mackenzie street. See BP-2022-00257 for the front infill building. ******THIS PERMIT HAS BEEN REVIEWED AND ISSUED UNDER THE REQUIREMENTS OF VBBL 2019 AND AMENDMENT EFFECTIVE JUNE 1ST, 2021.*********** Building Review Branch Notes: 1. Sch. A, Arch. B, D, Elec. B, Mech. & Plumb. B, Geo. B, Struct. B are submitted. 2. Path of travel to MCD exceeds 45m. Entire building is sprinklered to NFPA 13R requirements per 9.10.20.3(8)(b) requirements. 3. Entire building is fully upgraded per F4, S4, N4, A4 and energy upgrade per Table 11.2.1.4.(2). 4. Lagan case file was created on Dec 24th, 2021. Comply to VBBL 2019 amendment effective on June 1st, 2021. 5. All new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. Revision 1 - Minor changes per DP-2024-00752 and DP-2025-00079 (Issued March 30, 2026) 1. Revision to window divisions; 2. Revision to tru-cut stone veneer to arbutus field stone; 3. Change all proposed cedar cladding to Hardie fibre cement products; 4. Changed location of gas fireplace in MCD; 5. Added 1-1/2" concrete. topping to main and upper floor + combi boiler for in-floor radiant heating; 6. Misc. changes to walls and windows sizes. Removed openings on either sides of archway in front entry porch.

Application address
5595 MACKENZIE STREET, Vancouver, BC V6N 1H1
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 1200000.00

Type of work: Addition / Alteration

Property use: Dwelling Uses

Specific use: Single Detached House

Area: Dunbar-Southlands

Permit issued: 2022-12-16

Permit number created: 2022-01-19

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.