Building permit — Addition / Alteration · BP-2021-06811
Field Review - Addition / Alteration - #2900 - 29th Floor Interior alterations to convert an existing meeting room to a gender neutral washroom to an existing office tenant on the 29th floor (#2900) to this existing commercial building. Scope of work per VBBL 2019: demolish existing millwork, t-bar ceiling, door, glazing, acoustic panel and replace with new door, new millwork, electrical and plumbing work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. TENANT: Fasken OK for Field Review per Kim V - Jan 12/22 E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.