Project · Public

Building permit — Addition / Alteration — 5265 TAUNTON STREET, Vancouver, BC V5R 4B2

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Low Density Housing - Addition / Alteration - Exterior alterations to remove chimney, raise, stabilize the building and interior alterations for new millwork, appliances, electrical, plumbing, lighting and finishes throughout this…

Listed on FolioProjects
2026-11-28
Location
5265 TAUNTON STREET, Vancouver, BC V5R 4B2
Application number
BP-2022-00079
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:35:33.147347+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:37:19.77939+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2022-00079

Low Density Housing - Addition / Alteration - Exterior alterations to remove chimney, raise, stabilize the building and interior alterations for new millwork, appliances, electrical, plumbing, lighting and finishes throughout this existing, one storey, one family dwelling with existing detached 2 car garage at the rear, on this inside with lane site. Schedule B Structural submitted by Andrew B. Mclellan, P. Eng. of Structural Solutions Eng. Inc., Tel: 604 544 1082. Schedule B Geotechnical, Temporary and Permanent submitted by Geoffrey G. Dyer, P. Eng. of Terrane Engineering Group Limited, Tel: 604 770-0355. Revision 1 (R. Foster) issued (Oct 28, 2022) to change baseboard heating to a heat-pump central ventilation system. Changes include a new Heat pump located in the north/east corner of the building, 4.33 ft. from the property line and alterations to enclose and insulate a portion of the attic space to create a conditioned mechanical room for a new Air Handler. Notes: OK for heat pump to be located less than 5' from the property line with letter of support received from property owner at 5259 Taunton St as per David Jung, Renovation Center Manager. Separate Electrical permit required for installation of the heat pump. Notes: Energy Upgrade: As per REUP (energy requirements - 2021 per D. Jung) Sprinkler installation waived as per David Jung, Renovation Center Manager, March 30, 2022. No access to crawlspace This permit has been issued under VBBL 2019.

Application address
5265 TAUNTON STREET, Vancouver, BC V5R 4B2
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 145000.00

Type of work: Addition / Alteration

Property use: Dwelling Uses

Specific use: Single Detached House

Area: Renfrew-Collingwood

Permit issued: 2022-04-26

Permit number created: 2022-01-10

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.