Building permit — Addition / Alteration · DB-2023-04381
High Density Housing / Commercial - Addition / Alteration - Change of Major Occupancy & First TI #101 Exterior and interior alterations and Change of Major Occupancy from Office shell (Group D) to a Fitness Centre (Group A2) with sauna / cold bath services to provide improvements for a new tenant in unit #101 on the ground floor of this existing high building with 4 levels of underground parking. Exterior work to add louvres to the north (lane) elevation. This project is considered a small suite minor renovation and small suite change of major occupancy. Upgrade mechanism triggers F1, S1, N1, A1 apply to this project. Schedule A, Schedule B (Architectural) Peter Chu, AIBC Schedule D Karen Nga Kwan, P.Eng Schedule B (Mechanical & Plumbing), Charles W.Poowell, P.Eng. Schedule B (Plumbing), Van Minh Wayne Hua, P.Eng (cold baths) Schedule B (Electrical), Abdul El-Haddad, P.Eng. provided for this project. Building Review Branch Notes: 1. Separate sign permit required for new sign. 2. This permit has been reviewed under the requirements of the VBBL #12511 (2019) 3. Existing Universal Washrooms (2) provided in the building lobby. Revision #1- 2024-07-27- S.Le Architectural drawing A1: 1. Added Sauna clearance dimensions, and wall and ceiling construction notes; 2. Added Ice Baths clearance dimensions; and 3. Removed the automatic door openers for doors (D9) and (D10) in the Door Schedule. Architectural drawing A2: 4. Added suspended ceiling details. Revision #2- 2024-11-01- S.Le Remove Vancouver Coastal Health condition, recirculating cold plunges permitted. Refer to related plumbing permit.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.