Building permit — Addition / Alteration · BP-2022-04691
Field Review - Addition / Alteration - #2300 - 23rd Floor Interior alterations to provide tenant improvement to an existing office tenant on the 23rd floor (#2300) in this existing commercial building on site. Scope of work: remove/construct select partition walls, doors, finishes, ceiling work, millwork and electrical work. NOTE: Reception on this floor (#2300). 23rd & 24th floors (#2300) are interconnected by an internal stairway occupied by a single tenant. TENANT: TELUS Communications Inc Letters of Assurance submitted by: Schedule A , Schedule B, John E. Gustavson, Architect, ph: 604-687-2511 Mechanical Schedule B, P. Eng., Maciej Sobczyk, P.Eng., ph: 604-375-9756 Electrical Schedule B, Andrew Tashiro, P.Eng., ph: 604-685-9381 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy Upgrade: E2 - Lighting - Upgrade to Bilevel Lighting Control (per 9.4.1.1.(d) of ASHRAE 90.1-2016 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.