Building permit — Addition / Alteration — 510 W 8TH AVENUE, Vancouver, BC

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Interior alterations to install racking systems near the loading area for the existing retail tenant at 510 W 8th Ave (Whole Foods Market) in this commercial building on this site.

Listed on FolioProjects
2026-11-28
Location
510 W 8TH AVENUE, Vancouver, BC
Application number
BP-2021-00738
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:05:38.703561+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:22:15.702711+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2021-00738

Field Review - Addition / Alteration - Interior alterations to install racking systems near the loading area for the existing retail tenant at 510 W 8th Ave (Whole Foods Market) in this commercial building on this site. OK for field review as per Jamie Zhang, Mar. 2/21 This is a sprinklered building - District Building Inspector to determine if a Sprinkler Permit is required at time of field review inspection - see letter on file from Fast Automatic Sprinkler Technology Ltd. See operational letter dated June 18, 2020 No energy upgrade required - Exemption Checklist submitted Structural Schedule B submitted by Ayaz Waseem Malik, P.Eng. 604.940.4000 Notes: 1. District Building Inspector (DBI) to confirm sprinkler coverage at rack storage. Sprinkler coverage shall meet the requirements of VBBL and NFPA 13. 2. Building Sprinklered – Sprinkler vs Rack Storage letter dated February 24, 2021 submitted by Peter Shires P.L.Eng. of FAST Automatic Sprinkler Technology Ltd. T: (604) 534-9426. a. Storage - Exsiting Sprinkler System designed to Ordinary Hazard Group 2 (0.2 USGPM/SQ.FT.) . Per Letter from Peter Shires P.L.Eng. of FAST Automatic Sprinkler Technology Ltd. the sprinkler system will allow for storage of non-encapsulated , non-plastic products to a maximum of12 ft. in storage height, and plastic non-encapsulated to a maximum of 10 ft. in storage height. 3. Separate permit and documents required for any changes in the storage configuration. 4. Separate sprinkler permit and documents required for any alterations to the fire suppression system. 5. Permit reviewed during COVID-19 pandemic.

Application address
510 W 8TH AVENUE, Vancouver, BC
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 9000.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Parking Uses

Specific use: Not Applicable

Area: Fairview

Permit issued: 2021-05-11

Permit number created: 2021-03-02

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.