Building permit — Addition / Alteration · DB-2021-01291
Field Review - Addition / Alteration - 510 E 7th Ave Exterior and interior alterations to add a new rear deck, new stairs and provide alterations including new windows and doors for this existing side by side two family dwelling on this inside with lane site. Scope of work also includes installation of four new windows on east elevation, relocate fireplace, new shower/steamroom, relocate toilet Exterior alterations approved by K. Kallweit-Graham, March 24, 2021 Revision #1: - Expand the ground floor bathroom into the living room - Relocate door and add glazing to the interior wall of the ground floor bedroom - Replace ground floor fire place and change the location of the adjacent windows - Add door to north face of garage B.Wong - Jan 25 This is a sprinklered building. District Building Inspector to determine if a Sprinkler Permit is required at time of the field review inspection. District Building Inspector to determine if a structural Schedule B is required for any wall removal. REUP submitted by Peter Cho, City Green Solutions - Upgrades required as per Table 11.2.1.4.(2)
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.