Building permit — Addition / Alteration · DB-2024-04500
Low Density Housing - Addition / Alteration - Exterior and interior alteration and change of use of this existing character assessed single detached house to a single detached house with a secondary suite on this inside with lane site, per retention drawings submitted by SGDI and signed March 13, 2025. Scope of work includes relocating the building 8'-0" east and raising it to allow for ceiling height increase in the basement. Building to be sprinklered to NFPA 13D standard. NOTE: - Non-conforming rear yard relaxed per Shelley D. on Sep 5, 2024 - Relocation and raising of the building and new front porch cleared by POD Shadi S. and Pegah S. on Feb 19, 2025 Revision #1: To change one window size on each elevation and interior layout changes to the suite. Exterior alterations reviewed by Pegah S. on May 29, 2025 B. Wong - Jun 3/25 Revision #2: - To update the site plan side yard setback to match the site survey - To change the name of the EA on file from Allen Joshua Selva Rabi, Capital Home Energy Inc, 604-562-0387 to Tommy Youngsung Byun - To update the basement slab from 3"XPS to 4" EPS B. Wong - Feb 10/26 Letter of support on file Schedule B, Structural, James Lee, P.Eng, 604-325-7503 REUP Submitted by Allen Joshua Selva Rabi, 604-562-0387. Scope of work to include energy upgrade in accordance with Article 11.2.1.4 of the 2019 Vancouver Building By-law and as per the Energy Efficiency Upgrade Details noted in the Energuide Report. *Selected upgrades: air sealing, increase insulation in attic and vaulted ceiling, insulate exposed spaces, heat pump, electric DHW, and bathroom timers.
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.