Building permit — Addition / Alteration · BP-2022-01000
Field Review - Addition / Alteration - #316 - 3rd floor Interior alterations to provide improvements to this existing dwelling unit on the 3rd floor (#316) in this existing multiple dwelling building on the site. Scope of work: remove/construct partition walls, doors, millwork, finishes, plumbing fixtures, ceiling work, lighting, electrical and plumbing work. Non Sprinklered Building OK for Field Review per K. Vogt February 25, 2022 The following E-2 upgrades have been selected: E2 - Lighting - Install lighting dimmer, timers, and/or motion detectors on interior lights E2 - HVAC - Install timers (up to 60 minute), or humidistat for washroom fan(s) E2 - HVAC - Install properly supported ceiling fan Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.