Building permit — Addition / Alteration · BP-2022-03847
Field Review - Addition / Alteration - Interior alterations to demise retail unit 4511 Rupert St into 4509 Rupert St and 4511 Rupert St, retaining 4509 Rupert St as small suite retail and a change of use from retail to a small suite office for 4511 Rupert St on the ground floor of this mixed-use building on this site. Scope of work includes reconfiguring the walls at the rear of 4511 Rupert St so that the existing accessible washroom becomes a part of the common corridor. OK for Field Review per W. Wong - August 4, 2022 Notes: - Energy Upgrade: E2 - Lighting - Upgrade to incorporate Automatic Full OFF (per 9.4.1.1.(h) of ASHRAE 90.1-2016). - Schedule B, Architectural, Shun Yao (Michael) Lu, Architect, 778-322-8158. - This building is not sprinklered. - Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, posters, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.