Building permit — Addition / Alteration — 450 E 35TH AVENUE, Vancouver, BC V5W 1A9

Source: Vancouver — Issued permits — 2023-2025

Field Review - Addition / Alteration - Interior and exterior alterations to this existing One Family Dwelling.

Listed on FolioProjects
2026-11-27
Location
450 E 35TH AVENUE, Vancouver, BC V5W 1A9
Application number
DB-2023-00154
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:55:27.559964+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:27:34.429688+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · DB-2023-00154

Field Review - Addition / Alteration - Interior and exterior alterations to this existing One Family Dwelling. Letter of assurance submitted: -Sch B/D: Lucio Picciano, AIBC, 778.889.6849 Scope of work includes: Main Floor 1) Relocation of laundry room. 2) New floor & wall finishes throughout. 3) Removal of bulkheads from existing family room and den 4) New plumbing fixtures in Bath 2 and Ensuite. 5) New lighting throughout, retention of various lighting. 6) Bedrooms are relocated to main floor. Upper Floor 1) New plumbing fixtures in Bath. 2) Relocation of kitchen plumbing fixtures / gas stove & millwork / casework. 3) Removal of bedrooms and Ensuite. 4) New lighting throughout. 5) Vaulted ceiling. North Elevation 1) Replace upper floor windows with enlarged windows that follow vaulted ceiling shape. 2) Enlarge Main floor window. South Elevation 1) Enlarge upper floor kitchen window. 2) Replace lower floor family room window with glass French doors. 3) Remove exterior door on the Main floor. 4) Enlarge and add door from new proposed office space and guest room. Revision #1 to 1.Change the location of the Utility room from Main Floor to Upper Floor. 2.Remove the balcony on the Upper Floor. 3.Proposed patio door and window on the Upper Floor change to a window 4.Change in windows sizes as noted on South and North elevations 5.Change in Bathroom 1 size Revision #2 to perform Engineer's review Revision #3 to 1. A4.03 - roof assembly updated to include spray foam insulation 2. A8.01 - roof detail at existing wall updated to include spray foam insulation 3. A8.01 - added spray foam detail at pot lights

Application address
450 E 35TH AVENUE, Vancouver, BC V5W 1A9
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 325000.00

Type of work: Addition / Alteration

Permit category: Renovation - Residential - Lower Complexity

Property use: Dwelling Uses

Specific use: Single Detached House

Area: Riley Park

Permit issued: 2023-04-04

Permit number created: 2023-01-11

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.