Building permit — Addition / Alteration · DB-2020-00389
Field Review - Addition / Alteration - Interior and exterior alterations to provide improvements to this existing one-family dwelling building on the site. Scope of work: new interior layout, kitchen & bathroom updates, electrical work, enlarge 2 windows at the rear, remove one fireplace, relocate main entry door. Letter of assurance submitted: Sch B (Struct): Dr. S. Pishvaei, P.Eng, 604.992.9481 REUP prepared by: W. Cameron Lockhart (Capital Home Energy) 604.562.0387 EnerGuide File #: 58B1D00006 OK for Field Review as per S.Yu on Feb 3, 2020 Note: - Energy upgrades as per REUP dated March 22, 2022 Post Renovation assessment is required. - Smoke alarms to be installed in conformance with 3.2.4 and 9.10.19 as applicable. - Carbon monoxide alarms to be installed in conformance with 6.2.4 and 9.32.4 as applicable. - Main floor powder room to comply with VBBL 3.8.5.5. Adaptable Dwelling Unit Bathrooms. - New entrance door to comply with VBBL 3.8.5.3 Entrance Doors to Dwelling Units. Rev #3 - Apr 26 2022: ENTIRE BUILDING TO BE SPRINKLERED TO NFPA-13D REQUIREMENTS Updated details and REUP form; Sewer and water upgrade issued, SP will be required. Rev #4 - Oct 13, 2022: to add spray foam to deck over garage / habitable space and vaulted ceiling portions. CRP letter A, architectural schedule B and building envelope schedule D received for sprayfoam, Richard Kadulski, Architect AIBC, 604-689-1841 Revision #5 - Nov 29, 2022 To remove two fixtures on the upper floor (laundry room changed to storage) -> SW-2021-01780 will only require water upgrade (sewer connection upgrade to be removed, separate revision to SW processed by Engineering.)
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.